Return loop

Today sees the completion of the lower horse shoe loop, the project took a few months to complete but had to finish a number of side projects in between. I chipped away a few wheel barrow loads at a time of soil and clay taken from the upper horse shoe loop widening project that recently stalled upon the completion of the reversing loop.

The early days of a dreamer

Chunky GAP65 applied and solidified

"After every layer, Always Plate Compacter, Rinse & Repeat, always Repeat.."


Finished product

Ideally, somehow linking the 2 switches together would be preferable.



Alleyvale

Showing the results of another day of building the mower road network, level crossings now have external H4 1.8m panels 18mm thick, yet to b...