Fooling Around with Kiwi Trains: Adventures in 3D Modeling & Featuring 1:120 - 1:2 Scale : N, HO, O, G, 5inch, 7.25inch & 15inch Gauges! No Ads, Just Some Nutty Tales from Peter Bryant @ Portland Railroad, Northland NZ If the image has a star on the bottom right corner then its modified with AI and shouldn't be taken seriously.
This week I've been laying some artificial grass on the outdoor 1:24 gauge railway as an attempt to control the weeds and grass from overtaking everything. I also happened to have lots of old concrete bags laying around so I covered the embankment with em, pinning them in with 8" staples. For the grass mats which were 3x1metres in dimension I split them down the middle and stapled the mat into the wood base and on the ground pinned them into the ground with the 8" staples. The ground is covered with leftover plastic from the pond and soon to be covered with gravel.
Continuing the 3d printed bridge for the garden layout, we needed a concrete base for the 3d printed piers to sit on so after searching countless plastic bottle types I stumbled upon the ice cream containers and quickly realized it would suit my needs. I removed the bottoms of the container and slipped it into position, I packed the outsides with clay & small rock and proceeded to pour the wet concrete which is where the container sides started to bow outwars requiring some reinforcing with small sticks embedded in the clay. I vibrated the container for a few minutes removing the bubbles and covered it up for the night. When I removed the plastic this morning I was very pleased with the result. The second pier finished last night and when test fitting in place this morning the friction of the wood halfway down was to much, thus its halfway through receiving #40 sandpaper to enable a better fit.
The rockwork has been redone somewhat, the white pipe has been removed and the water now dribbles down over the rocks. A concrete path has been hidden on top of the dam to allow people to walk over.
Cementing in a pad for the Pier, Ice cream containers are not ideal without reinforcing the sides I've discovered.
The next morning, plastic formwork removed and im quite happy with the result, the exposed pier has been sanded back quite a bit due to a slight warp in the wood itself. Without sanding there would be no removing the printed pier.
Second pier almost touching the concrete, a bit more sanding to get it down flush
Playing with paint, also experimenting with various top caps with the lettering '2024" & "Portland Railroad" embedded into the sides.
A quick post showing the pond 1 gauge layout expansion. A raised wooden deck similar to the Westside of the loop upgrade at the start of this year. The old/current path sitting on concrete blocks have each slowly sunk in various ways and I'm not really happy with the size of it all anyway, so time to redo it and better utilize the space for future 1 gauge railways running in & out of the area via spiraling & tunneling under the 7.25 inch railway as an alternative to the "fence line incline" route.
The deck is cemented in place, the posts & struts are H3.2 and the decking made up from the old 25cm long sleepers from the 5inch railway. my wrist has developed more muscles from all the hammering! 4x $10 bags of nails for the sleepers alone.
This morning I spent some time running trains in the freezing cold & then the sun appeared so started filming, it does show the raised deck midway through planking so its relevant..
The new bridge will replace the existing one only re-using the existing piers, looking at many bridges at the moment and figuring out what I can realistically 3d print in a human timeframe
Showing the west side connection in works. The 7.25 turnout will be shifted right about a foot and tracks realigned then the shed will extend out 4m further
The end point of the raised deck will connect with the wood deck coming in from the left
Reflections
Midway through decking, this design allows for the trackbed to be raised 2 inches if needed in the future? sinkage etc..
Loop complete
Siding entrance shifted back.
1:24 Ww makes another early morning run but now on the new raised track
I did borrow some audio from an actual Ww and attempt to poorly splice it in.
Showing the result of a couple pond liners now in place, filled with water and a small start to water plants & lilys thanks to a local friend "in the know" turned up randomly with an assortment of foliage in buckets upon hearing of the pond project. I too got quite excited with the idea of goldfish visiting the local petshop, I selected a variety of sizes & introduced them to the pond. They lasted 3 days before all suddenly disappearing! I have a 12v bilge pump, solar panel & regulator not yet installed but will form a water feature somehow & serve to filter everything. With a plan in place on expanding the garden railway with at least an additional larger loop around the perimeter of the pond. The big question here is obtaining more track..
Peacocks the size of buildings terrorize the 1:24 scale world forcing staff to shut down the railway as a safety precaution.
The long sought after dream of an actual outdoor layout comes to fruition finally. Starting things with a simple loop running around a water feature. The plan is to then create a line that connects the loop to the upcoming workshop.
Looking up at the site, still largely trees.
Half a year later after clearing out trees and foliage
2 months later and the G gauge loop is finished, the drive is in place, the 5 inch railway on the right has a 10 meter run and in the background the 15 inch railway has begun to be ballasted.
I setup a tent to house the battery and solar regulator and serve as storage for a couple of trains.
Showing off some pictures taken at michaels place, he has recently been busy with scenery and bridgework. I could only bring what models I had in auckland and no wagons. During the visit Mike produced a bag of bachman wheels and pointed out the lack of wagons, I have been toying with the Idea of making a rake of Lpa Highside 4 wheel wagons..
3D Printed bridge girders
Cameraman had a great vantage point hanging from a branch.
Showing off the third attempt at the DL, so far only the long hood has materialized. This time the side panels on the long hood open. Unlike the Dx the doors clip into place without having to drill tiny holes etc.
Some more work on the layout sees a Wharf in place and ready for track. The layout will have a branch line leading to the port. With a possible future addition of a loop enabling a train a straight run to the top. 3 sidings on the wharf are planned.
2 sidings on the wharf, and a line leaving bottom right to a future reversing loop
On the lower right, showing the tracks that will eventually be a reversing loop.
This time a video has been made since the upgrade of scenery on a part of the layout that made no sense at all. The bench was cut & lowered to the height of the riverbed of the inner shelf.
Before the changes..
Now the Layout looks something like below
NZ120 Db hauls Steam Coal Grab Crane
Steam Coal Grab Crane
NZ120 Db hauls Steam Coal Grab Crane
NZ120 Db hauls Steam Coal Grab Crane in background. SM Bus with a few details painted
Silver Fern crosses the bridge
Assembling a more modern bridge. Girder truss was a Kato N scake Truss
Building a bridge, again or still. When shopping around local dealers I came across thin wood & doweling in vast quantitys at ridiculous prices. So like anyone else I purchased what I needed to build a wooden trestle. Inspired by a bridge built by my granddad I went about creating one loosely based on the following photo's. Photo credit unkown.
The bridge area finally had a make over with 3 bags of 1kg plaster of paris being used to cover & shape the landscape. Mixing the plaster spoonfulls at a time into a container of water until all the water is absorbed allowed for a good 8-10 minutes of working time.
Belmont viaduct (near Johnsonville) shortly before being demolished - Credits?
Manawapou Viaduct 1966 - Credits?
A brave driver takes the NZ120 Q across the bridge mid construction
English Electric DF poses on the bridge shortly after completion
English Electric DF poses on the bridge shortly after completion
After plastering has been mostly used up, river is slowly built up in layers of PVA, water & colour pigment.
Da,Da,Db
A scene showing the back of the %100 Barrells store
Showing the state of the current road, the plan is a smooth plastered road to mimic a far north rural road, with at least tarseal. The bridge arch road tunnel will be one way & coloured to represent the age of the bridge.. DCC Sound DE using the chassis from the DH..
Showing the currently clay road, with a tunnel portal sitting in place on what could be part of a foundation. If only I can find the other tunnel portal...
Showing the cutting leading to the bridge & the road
Da,Da,Db
The bridge in the rear will be a girder bridge, 3d printed in sections. of concrete pillar & steel construction. If I get that far..., then the wooden trestle could be replaced with something quite ambitious indeed!
Using some photoshop skills I've recreated the scene a few times & have a few pics with added backgrounds to share as a result.