The Tree Hut Branch line. Part 1 of ∞

This week I kicked off the new road heading further into the property. The first section is a straightforward timber deck that branches off to the left from the lower horseshoe loop. I had considered another rock wall embankment, but this approach is much quicker taking a few days of work dodging the patchy rain and also guarantees an adjustable but smooth level run to the bridge over the creek. I will be using steel for the track, and now need to weld steel track in place far away from any power source. Once I make it to the bridge over the creek it drops away into a downhill grade toward the old treehouse and beyond.