Thursday, 7 March 2013

Kiwi Scenery

The layout is ever growing, some more pics showing off changes.
 The blue in the background is going to to span the entire layout.
The bridge offers a very level roadbed, much superior to earlier HO bridges. The bridge was made out of lengths of skirting wood & the poles are from a length of circular plastic about 11mm dia. The idea was a modern reinforced pre-stressed concrete bridge.
Showing off the underside of the second bridge. 

No comments:

Post a Comment

Shops

Showing of the Dairy build, 1 of 3 little shops to sit next to the hotel. Need to pickup some red paint and finish the Tip Top and Coke sign...