Wednesday, 28 August 2013

NZ120 DC Class after handrails

Last night the NZ120 DC class received handrails, so the model "crew" can remain "safe".

The wire is 0.4mm purchased from the local model shop. I drilled into the body, and then put a dab of superglue into the hole and then inserted the handrails. 
This system ensures the handrails wont break off as easily!






No comments:

Post a Comment

Alleyvale

Showing the results of another day of building the mower road network, level crossings now have external H4 1.8m panels 18mm thick, yet to b...