Thursday, 6 February 2014

NZ120 Ab work..

After many months the Ab gets some attention. It had an issue with bent valve gear and a missing screw. After fixing the problems I installed a brass nzr coupler on the front, and suddenly the loco isn't embarrassing.. 
Finally able to stretch its legs without jumping off the tracks.

Despite being a brutally close up shot, and the compromise on the tender bogies for nz120 its quite tidy!

A wee vid of the loco running around with various consists, The sepia filter probably wasn't required, but an interesting once off!

No comments:

Post a Comment

7.25" Gauge Engine shed expansion

Its been a bit since the last post and figured autumn is a good time. The engine shed has been somewhat expanded, I started with removing th...