Wednesday, 15 August 2018

Ka & Kb (Full Streamlining) Pictures

After going through grandfather's photo album on J's & K's I found a few relevant pics handy for detailing I may as well share, rather than keeping them hidden away.
Interestingly the streamlining was removed 1948 - 49 when the A C F I feed water heating apparatus was removed. Kb were built at hillside (not Hutt) and were fitted with a booster two-cylinder auxiliary engine which could be cut in at low speed for starting or heavy grades.

NZR Ka Class

NZR Ka Class

NZR Ka Class

NZR Kb Class

NZR Kb Class

NZR Kb Class

3 comments:

7.25" Gauge Engine shed expansion continued

 Continuing on with the shed build, One night I was on Temu and found this item  "A Set of 100pcs of 3D Brick Wall Decals, Made of Foam...