The long sought after dream of an actual outdoor layout comes to fruition finally. Starting things with a simple loop running around a water feature. The plan is to then create a line that connects the loop to the upcoming workshop.
Looking up at the site, still largely trees. |
Half a year later after clearing out trees and foliage |
2 months later and the G gauge loop is finished, the drive is in place, the 5 inch railway on the right has a 10 meter run and in the background the 15 inch railway has begun to be ballasted.
I setup a tent to house the battery and solar regulator and serve as storage for a couple of trains.
Ww makes a trial run hauling coal
No comments:
Post a Comment