Sunday, 27 February 2022

A turnout for the better

 Today the top triangle edges closer with the first of 2 turnouts a good way into construction, I'm replacing the sleepers with harder treated wood to hold it all together.



Completed first turnout, wagons run through perfectly. The frog I ended up having another go at with a decent cutting disc, now a 4 wheel wagon runs through having all 4 wheels supported. The blades are currently held together temporarily with a piece of wood, friction alone holds it into place until I fabricate something out of steel.



2nd Point finished, wagons once again glide through. Lots of landscaping & earthworks continue.






No comments:

Post a Comment

7.25" Point signals

A quick post showing off the points, simple to install and can be removed and stored inside when not in use. It uses micro switches attached...