Thursday, 19 March 2026

7.25" NZR Da

Finally the NZR Da arrives on the 7.25" railway after 1 year since I first got it. I built a shed for it and increased the radius of the top horseshoe loop. No issues with the track to report, and a quick video of it having a run.


No comments:

Post a Comment

Alleyvale

Showing the results of another day of building the mower road network, level crossings now have external H4 1.8m panels 18mm thick, yet to b...