Saturday, 3 May 2025

7.25" Point signals

A quick post showing off the points, simple to install and can be removed and stored inside when not in use. It uses micro switches attached to a rod that connects to the points/turnout. The lights seem simple enough to replicate for the other turnouts, a good winter project for rainy days.

With regards the block signals, an Idea was to use security PIR sensors set above various positions wired back to a hub to control the signal outputs.




The lower horseshoe loop now has track in place and is now a gentle smooth ride around rather than the roller coaster it was.

No comments:

Post a Comment

15" inch gauge track

 Heavy track in place, my poor back needs a brace!  We had Brian from work visit and lend a hand. The first rail we managed to drag down wit...