With all the wet weather it recently occurred to me I still haven't replaced the last pallet bridge, and when clearing the drain I noticed a wee cave in and debris building up with a few branches mixed in with the clay. So the decision has been made to remove the pallet bridge and replace it with my 2 remaining railway sleepers.
 |
Track & ballast removed, now the digging resumes. |
 |
Much later that day, found one sleeper, cannot seem to find the other one. |
 |
The original pallet bridge in place, very optimistic roadbed in the background but had to start somewhere. |
 |
After clearing up what I could reach without crawling inside. |
 |
A reminder of what happens to a blocked drain, and a sign from god 5" is to small. |
No comments:
Post a Comment