Monday, 4 March 2013

March, Making Bridges...

Last weekend saw the layout receive more attention, with the replacement of the twin bridges. Still needing alot of work in terms of weathering!

The intention is to lay this horseshoe curve in flexi, but I do prefer this current method of track due to  its ability to make the appropriate click clack noise every 15ish cm's.





The locomotive range so far, The K is scratch built & like most of my other scratch built steamers this will also be designed in 3D & printed.

No comments:

Post a Comment

Alleyvale

Showing the results of another day of building the mower road network, level crossings now have external H4 1.8m panels 18mm thick, yet to b...