Monday 6 April 2015

Showing the Wharf area

Some more work on the layout sees a Wharf in place and ready for track. The layout will have a branch line leading to the port. With a possible future addition of a loop enabling a train a straight run to the top. 3 sidings on the wharf are planned. 

2 sidings on the wharf, and a line leaving bottom right to a future reversing loop



On the lower right, showing the tracks that will eventually be a reversing loop.

Building an brick arch railway bridge

After receiving some used bricks I spent some time wandering youtube and stumbled across DIY videos of people building brick archways and fi...