To populate Alleyvale and turn it into a thriving town. Brad told stories of his hard life going from place to place before arriving here on the back of a guards van firmly fixed in place with a ziptie. Thanks to my brother David I have a few sheets of plywood so used that to great effect. Still to sort the windows with suitable acrylic sheet.
![]() |
| House in position, still to reshape the land and install a g gauge loop around the house, driveway, carport & fence. In the rear the first section of road cemented in place. |
![]() |
| Onto the next project, a small hotel with covered veranda, making good use of the jigsaw |
![]() |
| At this point I think a veranda might be nice, a place to sit and look at the passing trains |
![]() |
| Brad sizing the place up, showing off the "scrap wood" part of it. He does nothing but just stares out the window all day.. might get him a barbie, probably one that doesn't talk. |
![]() |
| The bottom floor, here will be the bar area. |
![]() |
| Everything somehow holding together long enough for a photo. Once the front balustrade is done the floor height wont be seen. |
![]() |
| Look at the appalling situation with Brad. He has most egregiously defaulted on his rent for five consecutive weeks. Furthermore, he has absolutely decimated the property; the sheer state of the place is a disgrace, and there is absolutely no question that his bond will be withheld in its entirety. He has finally been served with formal legal notice and has a mere three days to vacate the premises. We will naturally have to undertake a thorough deep-clean to return the property to an acceptable standard before we can place it back on the market. I intend to have the entire place repainted and plush new carpeting installed throughout. With any luck, our next tenant will be a properly tidy young lady. |
![]() |
| I found another 30cm male character named Tim "Buffer-Stop" Baker sitting inside the Da cab I completely forgot about, hes a bit more flexible and with more muscle than Brad. |
![]() |
| Buffer-Stop Tim's hands are able to grab the handrail! |
![]() |
| Dad tried out the road with his rideon mower to check clearances, made it through fine but could be a bit wider for comfort. Concrete held up without cracking. |
![]() |
| I'm going to have to redo this area and widen it. |
![]() |
| A splash of white paint later |
![]() |
| A start on the balustrade glued into place and a lick of paint added |
![]() |
| 3d printer back up and running, now printing window frames & gingerbread trim. eventually settled on a top curved window frame so I could print vertical without support material |
![]() |
| A bit dark but the 2 windows are in place, the curved window stands out better |
![]() |
| Gingerbread trim glued in place, all window & door frames in place |
![]() |
| Lights in the process of installation, solar powered and set to turn on after dark. Using 5v leds for lighting. |
![]() |
| Street facing side. 2 lights per floor |
![]() |
| Top floor wall in production, windows and door frame currently being fabricated in the 3d printer. |
![]() |
| On the bottom floor Brad showing off his 18v drill to Penny. I will need more than one light is the common complaint. |
![]() |
| Another solar battery unit installed running 5v lightstrip cut and wired together using CAT6 cable. |
![]() |
| The orange 12v bulbs running on a 9AH battery will last about 5 hours, the white LED's before I cut it up lasted the whole night on prior testing, and I've used a third of the light strip so far. |
![]() |
| Top floor coming along nicely, window & door frames finished printing. |
![]() |
| "Alleyvale Hotel" signs 3d printed and attached. LED's wired in |
![]() |
| Rear of the building in place, a few screws and it pops off, Once in place the rear deck will be attached leading to the top loop railway. The front balcony will face the lower branch line. |
![]() |
| With the rear attached it might fit through the entrance |





































