Monday, 3 January 2022

Bridge #3

 Today see's bridge #3 started and finished followed by more clay extending the roadbed.

Crossing a small drainage channel with a pallet bridge. Going to put sides on it to hold the roadbed in place. and then proceed with more clay.



Cheap, effective. Since the clay was dug from the lower pond its perfect for compacting into a solid form, almost like putty.

Cutting the growth back


The next day, using boards where the track connects to ensure nothing meets at weird angles as I move & lift track around messy gradients trying to get it right.



No comments:

Post a Comment

7.25" NZR Da

Finally the NZR Da arrives on the 7.25" railway after 1 year since I first got it. I built a shed for it and increased the radius of th...