Top Loop

On Thursday plans for a balloon return loop is finalized once realized & at 8am work commenced, 1 more bridge & lots of clay to shift. Already the lower track section is raised another foot. Retaining walls for the track bed are needed & the cheaper the better.

The track is going to be lowered so its at least a foot below the G gauge.
On the top right sleepers are finally laid on the 15" gauge road bed, already I can see some right of way issues arising.  





*Friday*
Earthworks mostly done for the top loop


*Saturday*
Widening of cutting and laying mix of gravel / crushed clay.
Building up roadbed over the new bridge and down to meet the other track.
Looking down - Top Loop

Looking up - Top Loop

*Sunday* 
Embankment now in place and more than a few barrow loads of clay building the roadbed up.


*Monday* 
7 square meters of gap40 blue/brown for the roadbed, got a decent way around the layout before the rain got too much. 


*Tuesday*
Spent the day connecting the track, spreading & compacting gravel.


*Wednesday*
Finished the top loop, all track connected, ballasted and levelled off. My wagon/tool bench runs derailment free and the roadbed is very firm. The turnout needed a tweek but otherwise worked out well.